CSS logo
CSS slogan - Strength and Support
Link to Home page
Link to About us page
Link to Services page
Link to News page
Link to Technical page
Link to Contact page
Our accreditations - Helifix and Easipoint

Case Studies: Royal Shakespeare Theatre

Click on the thumbnail images to see the progression of the works. The final repair is invisible.

Finished wall with invisible repair

Theatre from across river Drilling for ties Drilling for ties Finished wall

 

Project Name:Royal Shakespeare Theatre Transformation Project, Stratford-Upon-Avon
Client: Mace Group.
Project completed: February 2008.
Description: During demolition to the rear part of the Theatre our Client uncovered a large section of original brickwork which was not tied in to the main theatre structure. At over 14 metres high and with piling work due to take place next to the unsupported wall Mace needed a solution quickly to stabilise the potentially dangerous masonry. CSS proposed installing DryFix ties and after testing on site proved successful installed over 500 ties to secure the wall and allow the site schedule to proceed as planned.
Link to Services page
The Helibeam System provides a rapid and cost effective solution to a range of common structural faults - find out more.
Link to Technical information
We can provide excellent technical resources for the building professional, free to download.
(C) Cotswold Structural Services Ltd. 2007 to 2008 :: Site design and build: Red Box Consultants Ltd.